SECTION 4
MAINTENANCE
E. Conveyor Reassembly Into Oven
1. Lift conveyor and position it in the oven as shown.
NOTE: Conveyor may be inserted into either end of
the oven. If it is ti be installed from the non-drive end of
the oven the drive sprocket assembly must be
removed as shown in conveyor disassembly section.
2. Reinstall the conveyor extension.
Figure 4-21
Figure 4-22
Conveyor Extension
F. Checking Conveyor Belt Tension
WARNING
Oven conveyor belt must be cool when adjusting belt.
Do not adjust belt if HOT.
1. With the conveyor assembly in the oven, stand at
one end of the conveyor and check tension by lifting
the conveyor belt at the center of the oven chamber
opening (see Figure 4-23). The belt should not lift
higher then 1” to 2” (75mm to 102mm).
2. If conveyor belt is still not under proper tension, an
entire link must be removed. Use the following
procedure “H. Conveyor Belt Link Removal” to
remove a link. If conveyor belt is under proper tension
proceed directly to “J. Attaching Drive Chain”.
3. Newer model PS520-Series ovens have adjustment
screws at the end to tighten the conveyor belt. If these
adjustment screws are at their limit and belt tension is
still not correct, loosen the adjustment screws,
proceed to “H. Conveyor Belt Link Removal” to
shorten the belt and then return to “F. Checking
Conveyor Belt Tension” for proper adjustment. If belt
is tensioned properly proceed directly to “J. Attaching
Drive Chain”.